Funding
Fiscal Year 14-15
|
$100,000
|
$36,941
|
$46,144
|
|
Total
|
$100,000
|
$36,941
|
$46,144
|
$16,915
|
Project Description
Phase 1 is design. The existing concrete street is deteriorated with asphalt patches throughout. Additional deterioration is anticipated with the construction traffic from the 3rd Street project. The proposed improvements include removal and replacement of the existing concrete street with associated drainage improvements taking advantage of the new 3rd Street truck sewer system. This line item is for design in FY15 with construction to follow in FY16 (current FY16 construction estimate is $950,000).
Future Operating Impact
This project is only funding design at this time. Future operational costs are unknown at this time. Construction costs are estimated to be $950,000.
First Quarter FY 14-15
Design contract awarded.
Second Quarter FY 14-15
Project is under design.